
The centre section of the grid mounted on the deck

Frank having fun undoing all the lashings

Frank and Guillaume lowering the grid sections on sie

Each square had to be lowered in the numbered order

All hands to the pump

The final row

Frank lowers the final squareThe final row

Simon and Andy confirm the first section of the grid is in position

The second section of the grid is ready to construct

The first grid section can be clearly seen

David back on board watching

Dimitri Pletser with his father Dr. Vladimir carrying the grid pieces to their position

Dimitri and Guillaume putting the grid section together

Kathy and Frank join Dimitri and Guillaume

Kathy and Frank take over

The end section is added

Guillaume working on the northern corner

Frank working the southern section

Kathy and Sarah start measuring in the artefacts found on the surface

Flags mark where the artefacts are buried in the sea grass

Dimitri and Father position the "A" row

Timbers can be clearly seen under the sand

Floors and futtocks being uncovered

An iron keel bolt

Sarah and Kathy having finished their task

Sarah starting on another square

Kathy finding another section of timber under the sea grass


























